+90 212 803 0020 info@sdyenergy.com

Material supply for refinery and petrochemical units

In refinery and petrochemical projects the material selection follows the piping class list. Each class defines pipe material, wall thickness, flange class, gasket type, fastener and valve body together. We quote item by item against that list, and where we propose an equivalent outside the specification, we say so explicitly.

What a piping class defines

A line in a piping class defines a whole set, not a single item:

  • Pipe: material grade and schedule
  • Flange: class and face type
  • Gasket: spiral wound, ring and filler material — see how to select a flange gasket
  • Fasteners: B7/2H as standard, NACE compliant grades in sour service
  • Fittings: butt weld or forged; socket weld or threaded at 2" and below

Where the class changes, the item changes too. Catching those transitions correctly in the quotation prevents incompatible material appearing on site.

Sour service and NACE compliance

Fluids containing H2S carry a risk of sulphide stress cracking. NACE MR0175 / ISO 15156 defines hardness limits and production conditions for these services. In practice we watch:

  • Hardness values reported on flange and fitting certificates
  • Correct fastener grade, with coating that does not affect hardness
  • Documented post weld heat treatment on welded items
  • Separate confirmation of NACE compliance when an equivalent is offered

Certification and traceability

In process units the documents are part of the delivery. Depending on the scope we provide EN 10204 3.1 or 3.2 inspection certificates, heat number traceability, PMI reports, dimensional and visual inspection records and, where required, non destructive testing records.

Because the certificate level directly affects lead time, we recommend stating the required certificate with the enquiry.

Frequently asked questions

Can you quote without a piping class list?
Yes, provided material grade, pressure class and service conditions are stated. Without them, a price carries the risk of incompatible material on site.

Do you supply NACE MR0175 compliant material?
Yes. Flanges, fittings and fasteners for sour service are supplied with NACE MR0175 / ISO 15156 compliance reported on the certificate.

Does a 3.2 certificate extend lead time?
Usually yes. A 3.2 document requires approval by an independent inspection body or the customer representative, which adds time to production and shipment.

Send us your material list

Share your item list, isometrics or MTO file for your petrochemical requirement; we reply with price and lead time the same day.

Request a quote